The beginning
Our customer had some decking that another company had installed not that long ago that had rotted away due to the wrong materials being used. Along with some sleepers that had also perished.
Work we carried out
The existing sleepers and decking were removed and disposed of.
New pressure treated sleepers were installed along with Grey composite decking.
We also relocated the steps so that the decking area was larger and as a consequence had to create an access area for a manhole.
A much better finish that will also last much longer too.