The Beginning
Our client had a large driveway which was previously gravelled and they wanted to improve by making it easier to walk on but didn’t want block paving as they wanted minimum maintenance.
Work we carried out
The existing gravel was excavated and disposed of and new MOT type-1 hardcore installed and compacted.
New edging blocks were installed and the area at the front of the property widened to allow more space for parking.
Once the edging blocks were installed the entire area had an open course of bitumen laid and the area was once again compacted.
Finally after many days of rubbish weather we had the opportunity to finish the install with Pro Resin Alloy aggregate, trowelled by hand in UVR Resin at 18-20mm.
The customer is over the moon with the final result and the install has attracted a lot of attention from passers-by.