The Beginning
Our customers had a new conservatory being installed that they wanted to use Resin Bound for the flooring and to create two steps from outside.
Work we carried out
Aluminium edging restraints were used to edge the steps and both the conservatory floor and the steps were finished with Pearl Quartz aggregate bound in UVR Resin.
- Construction Date:
- July 2020
- Category:
- Resin Bound