The beginning
Our customers had a tired looking tarmac driveway that they wanted to improve the look of and at the same time extend in size to give better parking.
Work we carried out
Any loose tarmac areas were scrapped off and cut back for new base-work to be installed. A new extended area was designed and excavated ready for a full new install using MOT Type-1 and open course Bitumen.
The entire install was edged in a Charcoal block and finished in Golden Pea aggregate 1-3 and 2-5mm bound in UVR Resin with C52 filler, troweled at 20mm for vehicular traffic.