The beginning
Our customer in Eye had a tarmac driveway that they wanted to extend and also improve the access to the house for wheelchair use.
Work we carried out
The tree and turf were removed and a new base open course bitumen base installed to make the install fully permeable.
New edging blocks in charcoal we installed around the entire project and the install finished in Dobsweir Yellow aggregate bound in UVR resin at 18-20mm.
The entrance to the house was greatly improved by thickening the level to create a gradual incline.